The incident happened in the central engineering surfaces workshops - it is not actually concerned with production operations at the plant.
What does CE stand for?
CE stands for Central Engineering (Smithsonian Observatory)
This definition appears frequently and is found in the following Acronym Finder categories:
- Science, medicine, engineering, etc.
- Organizations, NGOs, schools, universities, etc.
See other definitions of CE
Other Resources:
We have 138 other meanings of CE in our Acronym Attic
- Abbreviation Database Surfer
- « Previous
- Next »
Samples in periodicals archive:
The EoACAyone-nation one test' plan applies to a common entrance exam for central engineering institutions, including the prestigious Indian Institute of Techology (IIT).
Steve Cox, UU central engineering services manager, said: This is bad news for thieves as it makes it increasingly difficult to sell their illgotten gains.
Steve Cox, UU central engineering services manager, said: This is bad news for thieves as it makes it increasingly difficult to sell their ill gotten gains.
SSC San Diego's Central Engineering Activity (CEA) Laboratory received the first chip-scale atomic clock from the National Institute for Standards and Technology (NIST) Laboratory last year and will start characterizing a new CSAC from Symmetricom Corp.
Central Engineering and Plant Systems: Yong Hwan KIM (Korea) Control/Heating and Current Drive Sytems/Diagnostics: Dhiraj BORA (India) With these designations the top management structure of the prospective ITER Organisation is now complete.
9 million [euro] Products: Fentanyl, buprenorphine, itraconazole, haloperidol Key Project Participants: * Manufacturers: SKAN, Hosokawa Alpine, AZO, Ensysta, Promatic B Designer: Janssen Pharmaceutica Chemical Production Engineering and Central Engineering Department, and Foster Wheeler/BNS Engineering * Equipment Suppliers: Skan, Azo, Alpine Timeline: * Concept/Mock ups: May 2000 * Basic engineering: October 2000 * Detailed design: January 2001 * Start installation: September 2001 * Mechanical completion: April 2002 * Process start up, qualification: August 2002 * Hand over to client (start validation): August 2003 * First commercial production: April 2004