His final assignment completed, John has continued to watch racing on the BBC and Channel 4, but in recent years his binoculars have stayed at home.
What does 10-98 stand for?
10-98 stands for Assignment Completed (police code)
This definition appears somewhat frequently and is found in the following Acronym Finder categories:
- Military and Government
- Abbreviation Database Surfer
- « Previous
- Next »
- Intoximeter Operator Needed (Alabama Public Safety Radio Code)
- Evidence Technician Needed (Alabama Public Safety Radio Code)
- En Route .. (Association of Public Communications Officers)
- Investigator Needed (Alabama Public Safety Radio Code)
- Coroner Needed (Alabama Public Safety Radio Code)
- In Service (police code)
- Estimated Time of Arrival (Alabama Public Safety Radio Code)
- Repeat/Say Again (police code)
- Mental Subject (police code)
- Arrived on Scene (police code)
- Records Indicating Wanted/Stolen- felony (Alabama State Police radio code)
- Records Indicating Wanted/Stolen - Misdemeanor (Alabama State Police radio code)
- 10-Mbps/100-Mbps Baseband Twisted Pair
- Continue/Proceed (HTTP status code; send request body, header received)
- Crystal Orientation
- 100 Mbps Fast Ethernet over fiber optic cable (IEEE standard)
- 100 Mbps Fast Ethernet over fiber optic cable (IEEE standard)
- Gigabit Ethernet, Fiber, Long Haul, Multimode
- Gigabit Ethernet, Fiber, Short Haul, Multimode
- Gigabit Ethernet, Fiber, Long Haul, Multimode
Samples in periodicals archive:
Dependent Variables and Measures Two dependent variables were measured: (a) the percent of assignment completed and (b) the percent of items correct.
The Linden Plaza disposition represents the latest assignment completed by the Metropolitan Area FSG on behalf of subsidiaries of Starwood Heller, LLC.
Surely, the correct interpretation is that the IC needs to maintain only the relevant work file on the assignment completed, but the appraiser who signs the report must maintain the true complete copies.
After the form is determined, I ask the students to connect their pots to the line drawing assignment completed earlier in the quarter.